Order lead-time estimate
Estimate completion in working days from backlog, order size and daily output.
Your starting point
LOCAL · PRIVATESample values are filled in. Change them to make this your own.
A little more clarity
RESULTYour result will appear here.
Run the sample to see how it works.Use this tool
- Enter backlog ahead of this order and the new order quantity.
- Set achievable units per working day.
- Add sequential processing and delivery working days, then calculate.
Reading your result
Production is rounded up to a whole working day. Processing and delivery are then added; the result is a duration, not a promised calendar date.
How this works
Ceiling((backlog + order) ÷ daily capacity) + processing + delivery.
Use the units shown beside each field. For monetary amounts, use one currency throughout; calculations do not convert currencies. Results normally display up to two decimal places. Nonzero values below 0.01 use up to six significant digits; values below 0.000001 use scientific notation (for example, 1E-7 means 0.0000001). Rankings use unrounded values, so displayed scores can look equal without being tied. CSV downloads retain numeric precision. Monetary rounding uses half-away-from-zero. Inputs or results beyond supported precision are rejected.
Assumptions & limits
All added stages are sequential. Working-day count only: no date, holiday or carrier-service prediction.
Required numeric fields reject blank, malformed and out-of-range values; negative values are allowed only for inventory position. Whole quantities are validated where units must be indivisible.
Results are planning aids based on the values you enter. Check important decisions and documents before using or sharing them.
Take the next step.
Browse practical guides ↗
PRACTICAL GUIDEReorder point and EOQ answer different questions
Keep replenishment timing separate from order quantity, then check packs, lead times and inventory position.
Read the guide
PRACTICAL GUIDEA net-zero stocktake can still hide a real problem
Read shortages, overages and absolute value variance before adjusting a stock record.
Read the guide