Production bottleneck
Compare serial workstation capacities and identify the limiting step.
Your starting point
LOCAL · PRIVATESample values are filled in. Change them to make this your own.
A little more clarity
RESULTYour result will appear here.
Run the sample to see how it works.Use this tool
- Set the minutes available per machine in the same period.
- List each serial station, its per-unit cycle time and parallel machine count.
- Calculate the limiting station and whole-unit output.
Reading your result
Station rows show continuous theoretical capacity. Finished units rounds the smallest station capacity down; line start-up and work-in-progress timing are excluded.
How this works
Station capacity = available minutes × parallel machines ÷ minutes per unit.
Use the units shown beside each field. For monetary amounts, use one currency throughout; calculations do not convert currencies. Results normally display up to two decimal places. Nonzero values below 0.01 use up to six significant digits; values below 0.000001 use scientific notation (for example, 1E-7 means 0.0000001). Rankings use unrounded values, so displayed scores can look equal without being tied. CSV downloads retain numeric precision. Monetary rounding uses half-away-from-zero. Inputs or results beyond supported precision are rejected.
Assumptions & limits
Continuous capacity model rounded down for finished units. Ignores changeovers, downtime, buffers and staffing conflicts.
CSV inputs support quoted commas, doubled quotation marks and quoted line breaks. Headers are case-sensitive; a maximum of 500 data rows and 200,000 characters applies per table.
Results are planning aids based on the values you enter. Check important decisions and documents before using or sharing them.
Take the next step.
Browse practical guides ↗
PRACTICAL GUIDEReorder point and EOQ answer different questions
Keep replenishment timing separate from order quantity, then check packs, lead times and inventory position.
Read the guide
PRACTICAL GUIDEA net-zero stocktake can still hide a real problem
Read shortages, overages and absolute value variance before adjusting a stock record.
Read the guide