Batch production sequence
Lay out consecutive production batches, including setup time, on one machine.
Your starting point
LOCAL · PRIVATESample values are filled in. Change them to make this your own.
A little more clarity
RESULTYour result will appear here.
Run the sample to see how it works.Use this tool
- List batches in the exact sequence you intend to run.
- Enter whole units, minutes per unit and setup minutes for each batch.
- Calculate the elapsed start and end minutes on one machine.
Reading your result
Start minute is measured from zero, not a clock time. End of one batch is the start of the next; setup is included in each duration.
How this works
Each batch uses setup + quantity × unit time; batches run in entered order.
Use the units shown beside each field. For monetary amounts, use one currency throughout; calculations do not convert currencies. Results normally display up to two decimal places. Nonzero values below 0.01 use up to six significant digits; values below 0.000001 use scientific notation (for example, 1E-7 means 0.0000001). Rankings use unrounded values, so displayed scores can look equal without being tied. CSV downloads retain numeric precision. Monetary rounding uses half-away-from-zero. Inputs or results beyond supported precision are rejected.
Assumptions & limits
One machine, continuous elapsed minutes, no breaks or date calculations. Does not optimize sequence.
CSV inputs support quoted commas, doubled quotation marks and quoted line breaks. Headers are case-sensitive; a maximum of 500 data rows and 200,000 characters applies per table.
Results are planning aids based on the values you enter. Check important decisions and documents before using or sharing them.
Take the next step.
Browse practical guides ↗
PRACTICAL GUIDEReorder point and EOQ answer different questions
Keep replenishment timing separate from order quantity, then check packs, lead times and inventory position.
Read the guide
PRACTICAL GUIDEA net-zero stocktake can still hide a real problem
Read shortages, overages and absolute value variance before adjusting a stock record.
Read the guide