Project quote breakdown
Turn estimated work, expenses and contingency into a transparent project price.
Your starting point
LOCAL · PRIVATESample values are filled in. Change them to make this your own.
A little more clarity
RESULTYour result will appear here.
Run the sample to see how it works.Use this tool
- List each task with hours and hourly rate, retaining the CSV header.
- Add direct expenses and a contingency percentage.
- Calculate and review the task totals before sharing your estimate.
Reading your result
Quote total includes rounded labor lines, direct expenses and contingency. Contingency applies to both labor and expenses.
How this works
Round each hours × rate labor line to cents; add expenses; apply contingency to that subtotal.
Use the units shown beside each field. For monetary amounts, use one currency throughout; calculations do not convert currencies. Results normally display up to two decimal places. Nonzero values below 0.01 use up to six significant digits; values below 0.000001 use scientific notation (for example, 1E-7 means 0.0000001). Rankings use unrounded values, so displayed scores can look equal without being tied. CSV downloads retain numeric precision. Monetary rounding uses half-away-from-zero. Inputs or results beyond supported precision are rejected.
Assumptions & limits
No tax, discount or contractual terms are inferred. Contingency is a cost buffer, not a profit margin.
CSV inputs support quoted commas, doubled quotation marks and quoted line breaks. Headers are case-sensitive; a maximum of 500 data rows and 200,000 characters applies per table.
Results are planning aids based on the values you enter. Check important decisions and documents before using or sharing them.
